HCMC Metro Line 1 Package 2 Aboveground Stations Crack Repair

  • Concentrate
  • General Construction Foundation

Xypex Vietnam is selected by GS Engineering & Construction to repair originally 300 linear meters of cracks at the 5 newly constructed aboveground Metro Stations. Cracks are cut to a U-shape groove and plugged with Xypex Concentrate Dry-Pac, then followed with two coats of Xypex Concentrate slurry.

Xypex was selected after trial repair comparing against Sika materials. Hoa Binh Construction is the subcontractor to monitor the repair process for the Thao Dien, Cat Lai, Rach Chiet, Binh Thai, and Hightech Park stations. Repair commenced in November 2016 and completed at the end of January 2017 with a total quantity of over 600 linear meters repaired for the above 5 stations.

Xypex will also repair the Thu Duc Stations once construction is completed.