Brewery Methane Tank

65 m of cracks on a seven meter high methane tank full of water was repaired by the use of Xypex. High pressure leaks were plugged with Patch’n Plug, followed by an application of Dry-Pac. Dampness persisted for three days and totally dried after the fourth day.