Sanyo Home Appliance Factory – Phase 1 & 2

  • Concentrate
  • Modified
  • General Construction Foundation

After waterproofing the phase 1 office roof with a bitumenous membrane during the rainy season, the portion of the factory gutter switched to using Xypex to reduce application time. Xypex products were also used to repair and waterproof a 100 m2 septic tank.

Two roofs of a toilet room and an utility room were also waterproofed with a two-coat system of Xypex Concentrate and Modified without any protection mortar. Following the excellent results, the main contractor, Obayashi Corporation continued to select Xypex to waterproof the factory gutters and a small roof at the phase 2 of this factory. Total quantities treated were approximately 4,100 m2. The project was completed in November 1996, and August 1997, respectively.