Thủ Dầu Một Park Swimming Pool

  • Concentrate
  • Patch’n Plug
  • Water Holding Structures

The perimeter walls of this swimming pool were seriously leaking due to a defective concrete pour. All defective concrete was removed and Xypex Patch’n Plug and Concentrate were used to repair and waterproof 80 linear meters of construction joints.